Jump to content

Artemis II

From Flerf Wiki
Revision as of 17:34, 6 April 2026 by MCToon (talk | contribs)

Quick facts

  • NASA reports Artemis II launched on April 1, 2026, at 6:35 p.m. EDT from Launch Complex 39B, Kennedy Space Center.[1]
  • Crew: Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen.[2]
  • Mission profile: roughly 10-day crewed lunar flyby and return using a free-return trajectory.[2]
  • NASA published dated mission-event coverage for launch, translunar operations, and lunar flyby windows.[3]

"Hello, World" paired images (about 19 seconds apart)

NASA released two Earth photos taken seconds apart with different camera settings (one emphasizes the night side, the other is the widely shared "Hello, World" view). The mission article and gallery pages below are the primary web entry points.

NASA web pages

Source files and EXIF metadata (originals + JSON)

Asset ID NASA Images catalog Original JPG Machine-readable metadata
art002e000193 images.nasa.gov orig metadata.json
art002e000192 images.nasa.gov orig metadata.json

Capture times in UTC (from EXIF, with subseconds)

These times come from EXIF:DateTimeOriginal plus subsecond fields in NASA's metadata.json / ExifTool output on the ~orig.jpg files.

  • art002e000193 (first exposure): 2026-04-03 00:27:20.82 UTC
  • art002e000192 ("Hello, World" / Earth From the Perspective): 2026-04-03 00:27:39.26 UTC
  • Elapsed time between captures: 18.44 seconds (same pair NASA describes as seconds apart with different settings)

Time zone note (camera vs file processing)

Classic EXIF stores DateTimeOriginal without a time-zone suffix. These files also include EXIF:OffsetTime of -05:00 on some tags, while EXIF:OffsetTimeOriginal is absent. That pattern commonly reflects ground processing workstation timestamps, not a reliable claim that the camera shutter clock was set to UTC−5.

For public mission timing, NASA's release context for this milestone aligns with reporting the capture instant in UTC as listed above (also consistent with subsecond ordering of the pair).

Why this mission matters for evidence discussions

1) It is not a single-organization story

Artemis II includes international participation (CSA crew member) and partner hardware programs documented in mission material.[2]

2) It has public, time-stamped operations

NASA published expected mission windows, event timings, and regular updates, including phases where communications are expected to drop behind the Moon and then return.[3]

3) It uses a testable trajectory model

The mission design is a free-return path in the Earth-Moon gravity system, which is an established, checkable orbital approach rather than an arbitrary claim.[2]

Mission timeline (primary-source snapshot)

April 1, 2026 (Launch Day)

Artemis II launch, April 1, 2026 (NASA/Joel Kowsky).
Artemis II crew walkout (NASA/Aubrey Gemignani).
  • Liftoff reported at 6:35 p.m. EDT.[1]
  • Core-stage cutoff/separation and Orion solar array deployment reported in mission updates.[1]

April 2, 2026

  • NASA reported perigee-raise burn completion and translunar injection preparation.[4]

April 6, 2026 (lunar flyby day in NASA schedule)

  • NASA published flyby coverage windows, including lunar sphere-of-influence milestones and expected far-side communications loss/reacquisition periods.[3]

Imagery with source provenance


Sources